News


aws German Key Technology Pavilion at 8th Renewable Energy Expo in Delhi

posted 19 Aug 2014, 08:52 by Management Info

German Pavillon Hall 7, Booth Nr. 7.37 (Ground Floor)





We welcome you to visit our "German Key Technology Pavilion" at the 8th Renewable Energy Expo from 03. to 05. September 2014. The German Key Technology Pavilion is being Organised by AW Solution GmbH (aws) during 8th Renewable Energy India 2014 Expo.







Here are our German Key Technology Partners at the aws booth:

h.a.l.m. elektronik gmbh (German Pavilion, Hall 7, Booth 7.37)

h.a.l.m. develops and delivers high-end measuring systems for photovoltaic technologies. h.a.l.m. offers Module Flasher with optional fully automated EL Test and Cell Tester. More Infos: www.halm.de

pi4_robotics GmbH (German Pavilion, Hall 7, Booth 7.37)
EL inspection systems by pi4 are perfect tools for process optimization and quality assurance at every production step. Our products in this area range from fully automatic high-speed in-line systems to manual systems that can be transported in a car boot. More Infos: www.pi4.de


ATN Berlin GmbH (German Pavilion, Hall 7, Booth 7.37)
Automated soldering for solar modules prodution. With the light soldering system LightBeam ATN is the market leader for selective light soldering. ATN is offering as well other semi automated module manufacturing equipment. More Infos: www.atn-berlin.de


Koenen GmbH (German Pavilion, Hall 7, Booth 7.37)
Since 1968, KOENEN has been the specialist for high-quality precision screens in the area of technical screen printing. The family-owned company develops and produces quality screens for applications in microelectronics, photovoltaics and in new markets. More Infos: www.koenen.de


LTi REEnergy GmbH (German Pavilion, Hall 7, Booth 7.37)
LTi REEnergy develops and supplies central inverters for large-scale photovoltaic power plants in the range of 250 kW up to 2 MW as turnkey stations.
More Infos: www.reenergy.lt-i.com


Welcome to Visit us  forthcoming 8th Renewable Energy India 2014 Expoat India Expo Centre, Greater Noida during 3 - 5 September 2014. "German Key Technology Pavilion" at Hall 7, Booth 7.37 Ground Floor.

German Key Technology Pavilion @ 8th Renewable Energy India 2014 Expo, Greater Noida 3rd to 5th September 2014

posted 22 Feb 2014, 02:34 by Management Info   [ updated 22 Feb 2014, 02:42 ]


The German Key Technology Pavilion is being Organised by AW Solution GmbH (aws) during 8th Renewable Energy India 2014 Expo by UBM 
India. 



The event offers German Small and Medium-sized Enterprises (SME’s) multiple opportunities to showcase their innovative products and services to Indian Renewable Energy fraternity under one roof. This will pave way for German companies to gain a foothold in the booming Solar PV market of India.

The German-Indian aws team has a vast experience in the Indian renewable energy sector and facilitates the participation of German companies at various trade expo’s.

Services offered:
  • Providing full service with respect to end -to -end planning and organizing pavilions at 8th REI 2014 Expo
  • Development and implementation of customized marketing and advertising tools for the participants inside the Pavilion. 
  • On-site support by the German-Indian aws team 
  • One- to - one business matching services with Indian Corporates. 
  • Organizing a special event during the expo for participating companies to introduce their products and services to industry experts.
  • Providing assistance to small and medium-sized businesses with regard to acquiring financial support for their participation at the expo, if required (after assessment) 

In addition, aws will organise an information event in Berlin in April 2014 as a precursor to the 8th Renewable Energy India 2014 Expo, highlighting the business opportunities that exist in the Indian market. Furthermore, experts will present the best of the case studies of conducting business in India.


pi4_panelvision 60s / 45s - low cost Alternative with brilliant EL image quality

posted 1 Dec 2013, 21:31 by Management Info

pi4_panelvision 60s / 45s is the low cost alternative to pi4 Economic and Automatic Electroluminescence module testers.
 
Pi4_panelvision can be easily integrated into existing and new production lines before and after laminate. The simple handling, the brilliant EL-image quality, and
robust, low-maintenance machine concept make the system to have one of the leading position the market of the low-cost systems.
  • high resolution of 0.04 mm / pixel 
  • EL-high image quality for simple diagnosis by the operator 
  • Cycle times of 45s or 60s 
  • simple line integration 
  • automatic transportation system 
  • small footprint 
By visual inspection defects like cracks, grid finger breakage, dark spots or solder errors may be easily detected. The information about the defects detected may be stored to a data base together with the images.

Small but powerful. A real all-rounder. The first PLATINUM® R3-S2 rolls off the assembly line.

posted 17 Nov 2013, 05:54 by Management Info

The PLATINUM® R3 family can welcome a new addition. The little brother of the R3-M, which in March was awarded
the Photon seal of approval with the rating “Excellent +”, is now available. Of course,  he PLATINUM® R3-S2 is equipped with the same technical features and offers an impressively high peak efficiency of 98.5%. The additional, second tracker ensures maximum flexibility even in tricky conditions such as east-west roofs, dormer windows or roof/garage combinations, which makes the R3-S2 particularly attractive for private photovoltaic systems. The PLATINUM® R3-S2 is available in four models ranging from 5 kW to 9 kW.

more information at: http://www.platinum-nes.com

Market Launch of Semi Automated Tabber Stringer TS240C at Intersolar India

posted 10 Nov 2013, 15:03 by Management Info


AW Solution GmbH (AWS) the Photovoltaic Key Technology Equipment provider in India is launching at the
Intersolar India event from 12. to 14. September at the AWS Booth 1452 with its German manufacturing partner, Olbricht GmbH the semi-automated Tabber Stringer TS240C .


“Based on our intensive interactions with our photovoltaic manufacturing partners in the last view years in India including the involvement of the local ribbon supplier into the development cycle of the Semi Automated Tabber Stringer System, we are happy to offer the best price performance Semi Automated Tabber Stringer in the market” says Markus Amendt, Managing Director of AW Solution GmbH.

Semi Automated Tabber Stringer TS240C

The Semi Automated Tabber Stringer TS240C combines the advantages of an automatic Tabber/ Stringer with the flexibility and investment cost advantage of a manual soldering process.

The System can solder up to 240 Cells/ Hour with just one single operator with a constant high quality of the solder joints and string pattern. With high uptime and minimal breakage rate the TS240C is designed to work reliable 24h/7.The semi automatic tabber and stringer unit is configured to operate where precision is required, and where expensive fully automation is not feasible.


2BB, 3BB 5”- & 6”- (Full, Half, Third) Cell Configuration

The different Bus Bar Kits (2 Bus Bar + 3 Bus Bar) and Cell Kits (1/2 Cell, 1/3 Cell) which are easy and fast to change give the system the required flexibility for the production of Standard and Non Standard PV Panels. All Key Processes like soldering Ribbon Unwinding-/ Streching, soldering, cell spacing is done automatically. All this features with the a fraction of the cost of a fully automated system.

We are welcoming the Intersolar India visitors at our AWS booth 1452 for a introduction of the Semi Automated Tabber Stringer TS240C.

AWS Solution to represent German PV inverter producer PLATINUM in India

posted 2 Nov 2013, 12:33 by Management Info


AW Solution GmbH (Berlin, Germany and Delhi, India) announced that it will start a business association with the German solar photovoltaic (PV) string inverter manufacturer Platinum GmbH (Wangen im Allgäu, Germany) for the Indian market in November 2013.

According to the company´s information, AWS represents and supports several German key technology providers in India with local service and engineering teams.



PV solutions include solar power storage, energy management

PLATINUM GmbH is a provider of solar photovoltaic solutions. The company’s product portfolio encompasses inverters, monitoring systems and solar power storage batteries as well as energy management solutions.

The PLATINUM inverters reach a peak efficiency of up to 98.6%. They are equipped with patented DIVE technology as well as with DUAL-X, SiC components and RAC-MPP for rapid location of the optimum working point. They are manufactured by Diehl Controls.

A six-stage quality test proofs the robustness and functionality of the system components. PLATINUM offers 10 year factory warranty, usually with the option of an extension to 20 years . The PLATINUM string inverters are available in power classes from 2 kW to 22 kW.

1-6 of 6